jspωiki
PostFlightEdirectoryCheckList

Overview#

These are items we need to make sure are inplace be for we declare Edirectory ready for use in production.

Any items that are not right, need ot be resolved before we allow the Server or Tree to be used in production.

  • Verfy hi and low alerting
  • Verify Indexes
  • Verfy Schema
  • Backups setup in cron and tested