!!! Overview
[{$pagename}] are Prescribed events are used in [Scrum] to create regularity and to minimize the need for meetings not defined in [Scrum]. [{$pagename}] are time-boxed events, such that every event has a maximum duration. Once a [Sprint] begins, its duration is fixed and cannot be shortened or lengthened. The remaining events may end whenever the purpose of the event is achieved, ensuring an appropriate amount of time is spent without allowing waste in the process.
Other than the [Sprint] itself, which is a container for all other [{$pagename}], each event in [Scrum] is a formal opportunity to inspect and adapt something. These [{$pagename}]s are specifically designed to enable critical transparency and inspection. Failure to include any of these [{$pagename}]s results in reduced transparency and is a lost opportunity to inspect and adapt.
[{$pagename}]s are:
* [Iteration] ([Sprint])
* [Iteration Planning] (Sprint Planing)
* [Daily Stand-up] (Daily Scrum)
* [Iteration Demo and Review]
** Sprint Review
** Sprint Retrospective
Read the [Scrum Guide|https://www.scrumguides.org/scrum-guide.html|target='_blank']!! More Information
There might be more information for this subject on one of the following:
[{ReferringPagesPlugin before='*' after='\n' }]
----
* [#1] - [Scrum Guide|https://www.scrumguides.org/scrum-guide.html|target='_blank'] - based on information obtained 2018-11-22